Skip to content

TurnkeyGrid-tie · Hybrid · Off-grid

Solar that keeps the lights on, with or without the grid.

We study the load, design the plant, supply the kit and install it. Then we file the net metering paperwork with your distributor and keep watching the roof after the scaffolding comes down.

Grid-tie, hybrid and off-grid, drawn to your load
3 designs
Net metering filed, inspected and metered
SREDA
Monitoring, cleaning and warranty handling
After handover

Three systems

Pick the system that matches the grid you actually have.

The same array feeds all three. What changes is what stands between the array and your loads: nothing, a battery, or a battery and a generator. Each diagram below is drawn to that system only.

Array
Inverter
Grid
Loads
The array runs the loads; whatever is spare goes out to the grid and the meter turns back.
01 / grid tie

Grid-tie

Panels and an inverter. No battery.

Every unit the array makes goes to your loads first and the surplus is exported on net metering. The smallest bill for the money, and the simplest thing to own.

Fits
Offices and factories on a steady feeder, where an outage is an event rather than a habit.
Watch out
No backup. When the grid goes, the inverter goes with it.

Modules, string inverter, meter, protection

Array
Inverter
Grid
Loads
Battery
The array runs the loads first, then puts the surplus into the battery before it exports.
02 / hybridMost asked for

Hybrid

Panels, a hybrid inverter and a battery.

The battery carries the evening and the outages; the grid covers the rest and takes the export. One inverter does the changeover itself, in milliseconds.

Fits
Homes and small offices where the grid is not reliable and the work cannot stop.
Watch out
The battery is sized for the essentials, not the whole house at once.

Modules, hybrid inverter, LiFePO4 battery, changeover

Array
Inverter
Generator
Loads
Battery
The array runs the loads and refills the bank at the same time.
03 / off grid

Off-grid

No grid at all, or a site the grid never reached.

The array and the battery are sized for the worst month rather than the best one, and the design carries a generator input for the cloudy weeks every year brings.

Fits
Farms, remote sites, telecoms, pumps and camps with no dependable connection.
Watch out
Sizing is unforgiving. A plant that is 20% short fails in the monsoon.

Over-sized array, large bank, generator input

The kit

Brands we specify, and can claim a warranty on.

A system is only as good as the service behind the sticker. These are the makes we work with because the parts are available here and the warranty is claimable here.

On the roof

Panels

Monocrystalline, half-cut, with the manufacturer’s 25-year performance warranty.

  • LONGi
  • JA Solar
  • AIKO
  • JinkoSolar
  • REC
  • Canadian Solar
  • Trina Solar

Conversion

Inverters

Hybrid units with export limiting and a generator input, so the plant can grow into the connection you want.

  • Sungrow
  • Huawei
  • GoodWe
  • Growatt
  • Solis
  • Deye

Storage

Batteries

LiFePO4 packs that talk to the inverter over CAN or RS485, so the limits come from the battery, not a guess.

  • Growatt
  • Solis
  • Sako
  • Sungrow
  • Huawei
  • Deye
  • Pylontech

Stock moves with the shipment. The survey quotes what is available and serviceable this quarter, not what a brochure said two years ago.

SREDA and the utility

The paperwork is part of the system, not an afterthought.

A rooftop plant is a grid-connected generator, and the distributor treats it as one. The file is what turns a working installation into an approved one.

Grid side

  • Net metering filed under the SREDA guideline, in the form your distributor asks for.
  • Application, inspection and the bidirectional meter followed through with DPDC, DESCO, WZPDCL, NESCO or your REB.
  • Export limited to the capacity that was approved, not to the capacity of the roof.
  • The approval is issued in your name, and the file stays with you at handover.

Site side

  • Earthing, surge arresters and DC and AC isolation to BNBC and IEC practice.
  • Structural and wind loading checked against the mounting and the roof it sits on.
  • Battery room ventilated and kept inside its temperature window, because heat shortens a bank.
  • Commissioning report, string test sheets and as-built single line diagram handed over.

Turnkey

One team, six stages, nobody to chase in between.

The reason solar projects disappoint is rarely the panels. It is the handover between the vendor, the installer, the electrician and the utility, and every one of those gaps is a week.

  1. 01

    Load study

    We list what you run, for how long, and what has to stay on during an outage. The bill gives the units; a clamp meter gives the peaks that size the inverter.

  2. 02

    Design

    Array size, tilt, shading, string layout, battery and inverter chosen for the peak and the night rather than for a round number on a leaflet.

  3. 03

    Supply

    Modules, inverter, battery, mounting and the protection. One bill of materials, fixed before the work starts, with no substitutions after the quote.

  4. 04

    Install

    Structure, earthing, surge protection, cable sizing and labelling. Every string is tested before the system is energised, not after.

  5. 05

    Approvals

    Net metering application, utility inspection and the meter change, handled by us and followed until the meter is turning the right way.

  6. 06

    Monitor

    Remote monitoring from the first day, cleaning and string checks on a schedule, and manufacturer warranty claims handled by us rather than by you.

Load calculator

Start with your load, not with our catalogue.

Tell the calculator what you run and for how long, and it turns that into a kilowatt-peak figure and a battery size. Bring the result to the survey and we will check it against a meter, the roof and your last bill.

Open the load calculatorFree · no signup

What that looks like

  • A flat with two air conditioners

    3 kWp and 5 kWh

    Lights, fans, fridge, one AC at a time, and the router on backup.

  • An office of twelve desks

    6 to 8 kWp and 10 kWh

    Workstations, a server rack and the cooling that goes with them.

  • A workshop with a 5 HP motor

    10 kWp and up, 20 kWh

    Motor starting sets the inverter size; the array follows the daytime load.

Starting points from jobs like these. The survey and the meter reading set the real numbers.

Questions

What people ask before they sign.

Anything missing, ask it on the call. We would rather answer it twice now than explain it after the scaffolding is up.

Ask us
Do I need a battery if I already have the grid?

Not for savings. A grid-tie system without a battery earns its keep through the daytime load and the export, and it is the cheapest way to cut a bill. You need the battery for the evening and for outages, which is a different question and a different budget.

What does net metering actually involve?

An application under the SREDA guideline, a technical inspection by your distributor, and a bidirectional meter that records what you import and what you export. The export is credited against the import on the bill. We prepare the file and follow it; the approval is issued in your name.

Can I start with the array and add the battery later?

Yes, if the inverter is a hybrid and the design leaves room for the bank. That is the reason we usually specify a hybrid inverter even on a job that ships without a battery: the second phase then costs a battery, not a new inverter and a rewiring.

What happens in the monsoon?

Output drops for weeks at a time, so a hybrid is sized on the cloudy-day load rather than the clear-day one, and an off-grid site gets a generator input. A plant designed for the best week of April is a plant that fails in July.

Who looks after it after handover?

We do, under a service agreement: remote monitoring with alerts, cleaning and string checks on a schedule, firmware and settings, and the warranty claim with the manufacturer if a module or an inverter fails.

The roof is small. Does that rule solar out?

Not necessarily. Higher-efficiency modules fit more kilowatts into the same area, and a canopy, a car park or a ground mount is often the better site anyway. The survey tells you what the space can carry before you commit to a number.

Tell us what you need to build, protect or automate.

A 30 minute call with an engineer, not a sales script. You leave with a clear next step, whether or not we work together.

Head office42, 43 Purana Paltan, Dhaka 1000, BangladeshVisits by appointment. Security incidents for managed clients are handled around the clock.